Allter Power
Sp. z o.o.

Challenge

Design of an integrated ethyl alcohol and biogas plant.

Scope

  • assistance in acquiring administrative permits and decisions
  • a complete design in all engineering disciplines
  • supervision of execution phase
  • start-up and post commissioning services

Result

A fully functioning ethanol and biogas plant.

Product specification

Installation Type

distillery + agricultural biogas plant – cogeneration CHP plant

Products
  • ethanol
  • 
electricity (renewable energy)
  • thermal energy (RES)
Feedstock
  • slurry
  • vegetable silage
  • food waste
Commissioning date

2012

Financing

EU Fund

Website

www.allterpower.pl