Allter Power Sp. z o.o. Challenge Design of an integrated ethyl alcohol and biogas plant. Scope assistance in acquiring administrative permits and decisions a complete design in all engineering disciplines supervision of execution phase start-up and post commissioning services Result A fully functioning ethanol and biogas plant. Product specification Installation Type distillery + agricultural biogas plant – cogeneration CHP plant Products ethanol electricity (renewable energy) thermal energy (RES) Feedstock slurry vegetable silage food waste Commissioning date 2012 Financing EU Fund Website www.allterpower.pl